AMBIO Installation List
Ambio-Neutralox Photoionization (PI) system installations
Size (cfm) |
Application | Location | Year |
1,200 | Fuch's ATAD, WWTP | Weirton, WV | 2009 |
1500 | Equalization tank, Industrial WWTP | Sturgis, MI | 2011 |
950 | Dewatering/Centrifuge building | Pagosa Springs, CO | 2011 |
100 | Sludge holding equalization tank | Orem, Utah | 2012 |
4550 | Headworks, WWTP | Missoula, MT | 2012 |
1500 | TWAS storage tank, WWTP | Missoula, MT | 2012 |
1200 | Headworks, WWTP | Miles City, MT | 2013 |
1200 | Sludge storage tanks, Industrial WWTP | Germantown, WI | 2013 |
20,000 | Sludge liming, Biosolids facility, WWTP | Sudbury, ON | 2015 |
1500 | Septage Receiving, WWTP | Sudbury, ON | 2015 |
6,500 | Thickener, WWTP | Sudbury, ON | 2015 |
390 | Septage Receiving, WWTP | Calgary, AB | 2014 |
25,500 | Headworks, WWTP | Sudbury, ON | 2016 |
175 | Two units, -Thickener, WWTP | Edwards, CO | 2015 |
17,600 | Polishing after ATAD biofilter, WWTP | Edwards, CO | 2015 |
1,850 | Headworks, WWTP | Butte, MT | 2015 |
2,650 | Primary Equalization Basin, WWTP | Butte, MT | 2016 |
1,200 | Headworks, WWTP | Millbrook, ON | 2015 |
2,200 | Thickening Buildings, WWTP | Niagara-on-the-lake, ON | 2017 |
6,500 | Headworks, WWTP | Niagara-on-the-lake, ON | 2017 |
150 | High Strength WW Tank | Thousand Oaks, CA | 2016 |
150 | High Strength WW Tank | Thousand Oaks, CA | 2016 |
50 | WW sump off gas | Thousand Oaks, CA | 2016 |
1000 | Chippawa lift stn | Niagara Region, ON | 2017 |
820 | pump stations | Ross Valley, CA | 2017 |
7400 | WWTP | Gimli, MB | 2020 |
4500 | pump station, Walkley Rd | Ottawa, ON | 2019 |
300 | Two units, Lift stations | Ottawa, ON | 2019 |
2150 | WWTP, Singapore | Singapore | 2021 |
1250 | WWTP | Star, ID | 2022 |
4000 | WWTP | Skagway, AK | 2020 |
1000 | Dairy, WWTP | Goodyear, AZ | 2020 |
150 | High strength WW tank | Thousand Oaks, CA | 2019 |
6000 | Kenwoods Pump station | Levittown, PA | 2021 |
1765 | WWTP | Bamfield, BC | 2022 |
3500 | Fuch's ATAD & WWTP | NE Brunswick, NC | 2022 |
7776 | Acres Pump station | Ottawa, ON | 2022 |
4045 | Hazeldean pump station | Ottawa, ON | 2022 |
1425 | Larkspur pump station | Marin County, CA | 2022 |
1000 | pump station | Ottawa, ON | In Progress |
Ambio-Neutralox Corona Discharge (CD) system installations
Size (cfm) |
Application | Location | Year |
2000 | Headworks | Evergreen, CO | 2010 |
5100 | Dewatering/Centrifuge building | Pagosa Springs, CO | 2011 |
Ambio Biofilter Installations
Size (cfm) |
Application | Location | Year |
11500 | Wastewater treatment plant | Fredericton, NB | In Progress |
5,735 | Odour Control, Wastewater Treatment plant | Sydney Harbour, NS | 2022 |
12,000 | Trans Aqua Wastewater Treatment plant | Moncton, NB | 2022 |
~1,000 | 2 beds re-build, Wastewater Treatment plant | Banff, AB | 2020 |
8,500 | Odour Control, Wastewater Treatment plant | Monroe, WI | 2019 |
12,800 | Odour Control, Wastewater Treatment plant | Lunenburg, NS | 2018 |
~10,000 | Re-build, Odour Control, Wastewater pump station | Ottawa, ON | 2015 |
14,000 | Odour Control, Wastewater Treatment | St. John, NB | 2012 |
13,000 | Odour Control, Wastewater Treatment | Grimsby, ON | 2011 |
1,500 | Odour Control, Wastewater Treatment | Evergreen, CO | 2010 |
10,500 | Odour Control, WWTP | Charlottetown, PEI | 2009 |
1,500 | Odour Control, WWTP | Fort Smith, AR | 2009 |
600 | Odour Control, WWTP | Rougement, QC | 2008 |
1,175 | Odour Control, Wastewater Treatment | Morrisburg, ON | 2009 |
2,300 | Odour Control, Wastewater Treatment | Amherstview, ON | 2009 |
9,000 | Odour Control, Wastewater Treatment | Summerside, P.E.I. | 2008 |
60,000 | Odour Control, Composting | Pickering, On | 2006 |
10,000 | Odour Control, Fertilizer Manufacture | Seymour, IN | 2005 |
1,000 | Odour Control, Sludge Dryer | Derry Twp, PA | 2007 |
33,000 | Odour Control, Sewage Treatment (whole plant) | Sault Ste. Marie, On | 2006 |
13,000 | Odour Control, Sewage Treatment (whole plant) | Pembroke, On | 2006 |
47,000 | Odour Control, Sludge Liming and Drying | St. Catherine, ON | 2007 |
52,000 | Odour Control, Sludge Liming and Drying | Halifax, N.S. | 2007 |
30,000 | Odour Control, Sludge Liming and Drying | Leamington, On | 2006 |
1,500 | Odour Control, TPS ATAD | Yorkville, IL | 2003 |
1,400 | Odour Control, Headworks & Sludge Storage | Kingston, On | 2003 |
500 | Odour Control, Headworks & Receiving Bldg | Friday Harbor, WA | 2003 |
4,000 | Odour Control, Fuch’s ATAD | East Wenatchee, WA | 2002 |
60,000 | Odour Control, Composting | Brookfield, P.E.I. | 2002 |
2,500 | Odour Control, Septage, ATAD, Sludge Dryer | Three Rivers, MI | 2002 |
2,500 | Odour Control, Headworks | Pittsburgh, PA | 2002 |
10,000 | Odour Control, Sewer Line | Edmonton, Ab | 2002 |
25,500 | Odour Control, Organics Recycling Facility | Toronto, On | 2002 |
12,500 | Odour Control, Sludge Liming and Drying | Sarnia, On | 2001 |
3,500 | Odour Control, Composting | Pembroke, On | 2001 |
4,600 | Odour Control, Trunk Sewer | Ottawa, On | 2000 |
600 | Odour Control, Fuch’s ATAD | Franklin, IN | 2000 |
600 | Odour Control, Fuch’s ATAD | Princeton, IN | 2000 |
6,500 | Odour Control, Chemical (design) | Toronto, On | 1998 |
2,500 | Odour Control, Pump Station | San Mateo, CA | 1998 |
500 | Odour Control, Chemical (pilot) | Toronto, On | 1998/99 |
450 | Odour Control, Peanut Roasting (pilot) | Toronto, On | 1998 |
250 | BTEX Control, Soil Vapour Extraction | Montreal, Qc | 1998 |
3,000 | Odour Control, Fuch’s ATAD | McMinnville, OR | 1997 |
1,500 | Odour Control, Sewage Treatment (whole plant) | Cardinal, On | 1996 |
1,500 | Odour Control, Sewage Treatment (whole plant) | Long Sault, On | 1994 |
9,000 | Odour Control, Composting | London, On | 1997 |
250 | Odour Control, PVC Glove Factory | Mississauga, On | 1995 |
1,900 | Odour Control, Industrial Wastewater Treatment | Ingleside, On | 1995 |
100 | BTEX Control, Soil Vapour Extraction | Vaudreuil, Qc | 1994/95 |
100 | BTEX Control, Soil Vapour Extraction | Hull, Qc | 1994 |